Following a Phase I Site Assessment, PIC recommended completion of a Phase II investigation at this site in Gardena, CA. The site had been used by various machine shops and automotive parts manufacturers which utilized various degreasing solvents onsite. This photo shows PIC overseeing completion of soil borings inside a warehouse building utilizing a track-mounted direct-push drill rig. The boring is located in close proximity to an existing clarifier the former tenants had installed to meet Los Angeles County Public Works stormwater requirements. PIC completed both soil and soil vapor sampling and testing at the site, finding no significant contamination and assisting the client to sell the property.